The scope of work involves the replacement of three spillway gates and related works, such as the hoist system, so they can retain and pass water in a controlled manner downstream post-earthquake, as well as the installation of new equipment, and upgrades to the existing protection and control equipment to meet current reliability and seismic standards.
This is the third project that Aecon has collaborated on for the Campbell River System. Further information about the project is available on BC Hydro's .